I am about to undertake my ensuite renovation,
I will be using gripset P39 with B50 Bondbreaker tape, Cement sheet on shower walls and aquacheck on the other 2 walls,
What is the requirements for stopping up the screw holes, horizontal joints and internal corners under the tile and wet areas? is it still required to mud and tape the joints even when applying Bondbreaker tape, waterproofing and tile adhesive over the top?
bigreader
HU-617978689
Related Discussions
Help needed please with front entrance.
Q
Need help with renovating a laundry (raising the floor)
Q
Not sure where to start!
Q
Do you ask your guests to remove their shoes?
Q
Kate
dreamer