House - All other
There are 5 of these: Each one has googles of movies. Here are some segments from the svaffolding:https://slide.ly/promo/share/5a50550a374e27cf727b23c9 https://slide.ly/promo/share/5a50550a374e27cf727b23c9 https://slide.ly/promo/share/5a50551ff8bb6e0b6f7b23c8 https://slide.ly/promo/share/5a505534374e279d747b23c6 https://slide.ly/promo/share/5a5058bc76e0dfaa0e7b23c7 4.25 https://slide.ly/promo/share/5a5058ecf8bb6ee9707b23c8 4.5 https://slide.ly/promo/share/5a5059a7b572982a3b7b23c6 https://slide.ly/promo/share/5a505b08b57298853b7b23c6 https://slide.ly/promo/share/5a50623cf8bb6e13777b23c6 https://slide.ly/promo/share/5a5062b3374e27ed7d7b23c6 https://slide.ly/promo/share/5a5064297a97fd217c7b23cb https://slide.ly/promo/share/5a534b99b57298c47e7b23c7 https://slide.ly/promo/share/5a535882374e2770267b23c7 https://slide.ly/promo/share/5a5595b676e0df3a327b23c6 12.5 https://slide.ly/promo/share/5a559b5c374e27154d7b23c6 https://slide.ly/promo/share/5a559c2876e0dfa6367b23c7 https://slide.ly/promo/share/5a559c5276e0df82357b23c9 https://slide.ly/promo/share/5a559c677a97fdbd0c7b23c7 https://slide.ly/promo/share/5a559c727a97fdca0e7b23c9 https://slide.ly/promo/share/5a559c96374e271e4c7b23c7...
HS1,HS2,HS3,HS4,HS5: [Delivery People. Tile Setter. MSTBTH] 5 of these. This is what the Bath and Toilet Rooms look like. In the Bath, the blue brick will be from floor to ceiling, 4 walls and floor tile too. In the Toilet Room, the wallpaper is on 4 of the walls, with a Japanese Tile Mural on the central wall, surrounded by the Navy Blue Paint. The Heron and Willows mural is level with the ceiling in The Toilet: The ceiling is dark blue (the same paint as the Navy brick.) The door and the woodwork is Commercial White. There is a cherry chair rail separating the wallpaper and Navy Blue paint under it. The window is cherry too (new window.) This work will be done by 10/30/2019.
HS1,HS2,HS3,HS4,HS5: [Delivery people. Artist. Steam Shower/Hot Tub Setter. MSTBTH] 5 per house. A tiled separate room with a shower, a wood bench, and steam vents for a steam before showering, bordered by 2 glass floor to ceiling walls and 2 tiled walls, the walls that separate the other L shaped room that has the hot tub in it: The entrance of the room leads to the little hallway of the Bdsuite by way of a glass door that seals moisture and heat in, away from the hallway. The tile will be blue in both the shower room, which is surrounded by 2 walls of blue tile and 2 walls of floor to ceiling glass with a glass door in it, and blue tile in the L shaped hot tub room also. In DNR1 and DNR2, the floor will be cut and the tub lowered into it; in BTH8,BTH9,BTH10, a subfloor will be built around the hot tub and a dust free ledge will be surrounding it to accommodate the shape of the tub. It will be 2 feet away from the glass wall that makes up the south by southeast position of the shower in DNR1, north by northwest in all other BTHs.
HS1,HS2,HS3,HS4,HS5: [Delivery People. Artist. Demolition Team. Concrete Setter. DNR4,LKT(little kitchens)] Concrete and dirt removal. There will be 5 to 10" of concrete removed in HS1, in the North by Northwest corner of the room, underneath where the washer and dryer were sitting. and before the design of the hot tub in HS1 is accurately measured. There will be cement leveling in HS1,HS2,HS3,HS4 and HS5 before the tiling of the room: This includes the 2 rooms, and part of it is moving the large HVAC equipment to the wall and condensing it as much as possible and attaching as much as possible away from the floor and to the wall. The goal is to maximize as much floor space as possible for the eventual hydronic cleaning and glockenspiriting of the space (that includes the design and the installation of the fish and turtle tanks in HS1 and the pool in HS5.) There will be a wall of storage lockers removed in all buildings. IN HS5, there will be 5 walls removed to loop in a pool. 6 of the little LKTs will be removed: DNR1(CL), DNR2(CL), HS1LBLB1[rev'd, HS1LB1KT now on south side of bldg.(room with cot, table and lamp)LB2(Door from LB removed and wall patched, The Safe Room)], LB2(re...
HS1: [Delivery People. Artist. Fish and Turtle Setters. DNR4 and DNR3] There will be cement leveling in DNR4 before the tile is layed: This includes the 2 rooms, and part of it is moving the large HVAC equipment to the wall and condensing it as much as possible and attaching as much as possible away from the floor and to the wall. The goal is to maximize as much floor space as possible for the eventual hydronic cleaning and glockenspiriting of the space. That includes the design of the installation of the hot tub and fish and turtle pools. There will be an ample amount of raised platform made from wood framed cement (5"H x 4'D x 20'W). This cement will be framed with a composite moulding that matches or exceeds my expectations of the moulding of the rest of the home: It will be an embossed cement design of turtles. After the concrete slab dries, there will be a solid block of wood and stones poured contained by metal walls before the heating elements are layed and the fish and turtle pool mosaic is inset into the final layer of cement. The glass floor of the pool and the walls will be poured on top of that: There will be no spaces between the mosaic and the glass floor. Be...
nice posts
pretty library
nice post
pretty house
nice porch
pretty staircase
pretty staircase
ER: Legs
ER: Legs
ER: Legs
ER: Arms
ER: chest
ER: abs
ER: shoulders
ER: hip flexor
ER: hamstrings
ER: Bi/Tricepts
ER: Arms
ER: stationary bicycle
ER: inner thigh
BDs(x4): 1 of these in the BDs(x4), next to the secretaries or the assigns
allBDs(x4): this is the coffee table
MSTBDR: 1 of these
FR: 1 of these
2ndBDR: 2 of these
LBBTH: 1 of these
LB: 1 of these
FR: 1 of these
LR: 1 of these
LR: 1 of these
SR: 1 of these
LR: 1 of these
SR: 1 of these
BLK: 1 of these
2ndBTH: The mirror
LB,LR,FR,SRs,BRs: 2 of these in FR,LR,LB and SRs (sitting rooms); 5 in 5 BDs
FE,BE(AO): 9 x 12" rug
WH: the doorknobs
BTHs: all houses
BRs: 3 rugs in each BD
FR,LB,LR,: 2 of these in FR,LB,LR
LB,LR,FR,SRs,BDs: 2 of these in FR,LR,LB and SRs (sitting rooms); 5 in 5 BDs
FE,BE(HH): 2' x 3' rug
KT: 3 of these over the island
This is the front of the palace. It will have a nice stone veneer that is old and beautiful. The windows will be outlined in an all white cement decorative moulding. The dormers will have an all white cement decorative moulding with a spalunked roofline decoration outlining the gable and its foundation. The roof material of the gable over the dormer is the same as the antique building. Behind the antique palace there will be my palace with the tall rotund centered at the middle. There are no columns on any of my palaces.
Q