AFTER: The couple removed the dark upper cabinets, painted the walls and ceiling white and added subway tile to the walls. The tile was left over from a project Travis’ father had worked on. “This is our temporary solution, but we are still really happy with it and will continue to use it as is,” Lindy says. Travis designed and installed the faux-coffered ceiling detail.
AFTER: The couple removed the dark upper cabinets, painted the walls and ceiling white and added subway tile to the walls. The tile was left over from a project Travis’ father had worked on. “This is our temporary solution, but we are still really happy with it and will continue to use it as is,” Lindy says. Travis designed and installed the faux-coffered ceiling detail.
Q