After - Bathroom tub wall makeover to add a shower.
Proposed drawing.
Client wanted to add a shower to the tub.
Originally the vintage green tile ended half way up the wall with one row of black liner tile and one row of green tile above with a narrower green border.
The client wanted to avoid destruction of the tile. The solution was to add a second row of new black liner tile with a co-ordinate green tile (off white tile option) that extends to the ceiling. Black liner is also used to outline the existing shower wall to complete the design. A shelf replaced the original towel bar location.
The original shower would be used for linens or shelving.