The Safety Letterbox Company
The Safety Letterbox Company
Average rating: 5 out of 5 stars2 ReviewsView Profile

Gasholders Project, London

We start 2018 with a case study that is truly the epitome of ingenuity and design! What a privilege to be involved in Gas Holders. King’s Cross is inextricably linked to London’s industrial past. The telescopic gasholder was invented in 1824 and provided the storage needed to meet the demand of an ever-expanding city. The interlocking gasholder triplets were built and revised between 1860 and 1880 and now, some 150 years later, they are once again responding innovatively to The Capital’s ever increasing population. Architects Wilkinson Eyre have produced a truly stunning and extraordinary development. Luxury apartments designed by Jonathan Tuckey Design have designed internal beauty that benefit from a Regent’s canal waterside location, breath-taking communal roof gardens, and an array of amenities elegantly furnished and dressed by London interior designers No12 Studio. Amenities include spa and gym, residents lounge and a sophisticated entertainment suite including private dining and catering kitchen, a 14 person screening room, with an adjacent elegant games room, for use before or after the show. The Gasholders lobby displays extraordinary attention to detail in its integration of the building’s industrial heritage with contemporary design and style. A 24-hour concierge team operates from a bespoke desk made in natural stone, while polished concrete floors with brass inlay, a sweeping spiral staircase and feature light sculpture introduce guests to the drama of the interior. It also houses the bespoke brass mailboxes painstakingly developed and created by our Innovation team. Back in 2014, we were approached by Wilkinson Eyre Architects to create a curved bank of mailboxes with particular emphasis on the hinge and finish, and the overall requirement for of course for a suitably stunning yet functional solution. The solution was carefully created over many months and site visits to ensure the brief was met, and finally installed on site late 2017.