George Amos
Stage 1 (completed): Garden clearance, remove unwanted trees and features, excavate/grade/level existing soil, reconfigure plumbing/drainage/irrigation, transplant existing plants, install Corten steel edging, install raised steel vege gardens, install organic compost/mulch to improve sandy soil, install Dromana Toppings pathway.
Stage 2 (not completed): Brushwood fencing, Steel Trellis fencing, Corten steel feature beds.
Stage 3 (not completed): planting out, additional features (wind chimes, birdbaths, artwork etc
Planters animal troughs