Absolute Project Management
Absolute Project Management
Average rating: 4.9 out of 5 stars33 ReviewsView Profile

2 bedroom flat renovation in a converted river-side Wapping warehouse, Matt

The kitchen was renovated relatively recently and was in good condition, so the client opted to keep it, but add elements to give the space a refresh. We replaced the chrome handles with matt black hexagon ones, adding to the industrial style in the flat. Reeded glass was fitted at the window to the communal atrium, adding privacy and a stunning feature. A grey glass splash back was replaced with dark ink matt wall tiles, which were fitted in a brick layout, adding to the industrial tone and working beautifully with the other finishes. The chrome tap was replaced with a matt black one, which was a perfect addition to the space. The result is a lovely kitchen that is a pleasure to be in, being fresh and airy, with a touch of luxe. Discover more at https://absoluteprojectmanagement.com/portfolio/matt-wapping/

This photo has no questions

Have a question about this photo? Ask our community.
What Houzzers are commenting on
Absolute Project Management added this to Kitchen Ideas24 November 2020

Neutral kitchen cabinetry made industrial with black hexagon door handles and dark blue-grey tiles