jessica_taylor6652

Poor tiling job?

J T
last year

Our main bathrrom is tiled floor to ceiling. Im not happy with how the tiler has not planned the tiling and now there are smaller tiles in the corner of the bath/shower which i feel could have been avoided and instead started a full tile from the corner and have the smaller cut tile on the other end of the wall …as you see this as you walk Im not happy with it. but wondering if that warrants redoing the entire 2 walls?




Leave it
Re do it

Comments (2)